Sync Project Level WBS Codes to NetSuite®
Background
Company level WBS codes are pulled down onto a project in Procore. Each full WBS code on the project (cost code, cost type, custom segment) will be synced to NetSuite® as an Item. The syncing of new WBS codes at the project level code is triggered in the following ways:
The WBS Code is used on a Subcontractor Invoice that is synced to NetSuite®.
The WBS Code is added to the Procore Budget and a manual Cost Code Sync is run.
Each project level WBS Code only needs to be synced once to create the NetSuite® Item. The NetSuite® Item will be a concatenation of the Procore project number + the WBS code. Once it is created via one of the above workflows, it is synced.
By design, the integration workflow for WBS Codes will sync and create the NetSuite® Item during Subcontractor Invoice export automaticallyif it has not already been synced previously. Generally, the only time you need to run a manual Cost Code sync is if you need the NetSuite® Item before a Subcontractor Invoice is exported for that WBS Code for the purposes of assigning Direct Cost transactions in NetSuite®.