Sync Project Level WBS Codes to NetSuite®
Background
Company level WBS codes are pulled down onto a project in Procore. Each full WBS code on the project (cost code, cost type, custom segment) will be synced to NetSuite® as an Item. The syncing of new WBS codes at the project level code is triggered in the following ways:
The WBS Code is used on a Subcontractor Invoice that is synced to NetSuite®.
The WBS Code is added to the Procore Budget and a manual Cost Code Sync is run.
Note
Each project level WBS Code only needs to be synced once to create the NetSuite® Item. The NetSuite® Item will be a concatenation of the Procore project number + the WBS code. Once it is created via one of the above workflows, it is synced.
Important
By design, the integration workflow for WBS Codes will sync and create the NetSuite® Item during Subcontractor Invoice export automaticallyif it has not already been synced previously. Generally, the only time you need to run a manual Cost Code sync is if you need the NetSuite® Item before a Subcontractor Invoice is exported for that WBS Code for the purposes of assigning Direct Cost transactions in NetSuite®.